Sound Transit (40+ projects)

  • Design, Environmental, and PM/CM Contracts
  • Auburn Station Parking Garage & Access Improvements
  • Kent Station Parking Garage & Access Improvements
  • West Seattle Link Extension Final Design
  • Beacon Hill Light Rail Station Smoke Evacuation Testing & Resiliency
  • Mountlake Terrace Garage Assessment
  • Downtown Seattle Transit Tunnel Vertical Conveyance Upgrades
  • Tacoma Hilltop Link Extension
  • Tacoma Dome Link Extension (TDLE)
  • TDLE OMF South Phases 2 & 3
  • Federal Way Link Extension
  • Redmond Link Extension 30% Design
  • Angle Lake Station & South 200th Street Link Extension
  • East Link 30% Design

King County Transit (100+ Projects)

  • State of Good Repair Program
  • Bellevue Base Vehicle Maintenance Bus Lift
  • Transit System Electrification Planning
  • South Annex Base (to 90% design), Net Zero & LEED Platinum Goal
  • Central Base Cathodic Protection for USTs
  • Atlantic Base Hydraulic Lift Replacements
  • South Base Fire Loop Forensic Study
  • Atlantic Base Cx for HVAC Upgrades
  • Transit Control Center Expansion Study
  • Division-Wide Design Standards
  • Atlantic Base HVAC Replacement
  • Tukwila Base (formerly South Annex Interim Base)
  • CSC Frame Rack Installation
  • CSC Paint Shop Ventilation Upgrades
  • Bellevue, Atlantic, & Central Base Hydraulic Lift Replacements
  • North Base Garage Ventilation and CFD Analysis
  • South & Atlantic Base Expansion
  • Energy Audit at Three Bases
  • Bellevue Base Renovation & HVAC Upgrade

Washington State Ferries (20+ projects)

  • Anacortes Ferry Terminal (pre-design through 90% design)
  • Eagle Harbor Maintenance Facility Weld Shop
  • Kingston Ferry Terminal
  • Vashon Passenger Ferry Shelter

Pierce Transit

  • TAMP Assessment
  • Paint Shop Upgrades
  • Building 6 Fire Protection

Whatcom Transit

  • Maintenance, Operations, and Administration Building (MOC AB) TI
  • MOAB Renovation & Expansion
  • MOAB HVAC Controls Upgrade

WSDOT/ODOT Interstate Bridge Replacement 30% Design

Community Transit Hardeson Campus Vehicle Maintenance Paint & Prep Booths Implementation Design

Project Summary

Additional Transit Projects

Markets Transit & Transportation

All-electric energy codes go statewide

The 2021 Washington State and Seattle energy codes take effect soon. For the first time, all-electric systems are required statewide.

A Space to Learn Wine

Check out our work on the WSU Wine Science Center!

A Cafeteria for the Earth

The new cafeteria at Green Lake Elementary features state-of-the-art sustainable design.