Temple of Justice Temperature Control Improvements
FSi provided mechanical engineering services to study the temperature control deficiencies in the 90-year old Temple of Justice.
FSi interviewed maintenance personnel, visited the site and reviewed the existing drawings to determine the causes of the chronic over-heating/over-cooling in this building that was renovated less than 10 years ago. FSi prepared a report that outlined potential corrections to the mechanical systems, estimated the construction costs, and gave recommendations for action.