United States Postal Service On-Call Services
FSi has provided mechanical and electrical engineering services for several USPS projects over the last three years.
- United States Postal Service On-Call Services FSi has provided mechanical and electrical engineering services for several USPS projects over the last three years. FSi’s work includes: evaluation of existing systems, cost estimating, documentation of existing conditions, peer design review, HVAC design, plumbing, piping systems, electrical design remodel and new construction. Projects include: • Edmonds MPO Boiler Replacement – Currently providing the mechanical and electrical design to replace an older, oil-fired hot water boiler with a modern gas-fired boiler. (Total project cost: $10,000) • Ellensburg MPO HVAC Replacement – Mechanical and electrical design for the replacement of old, troublesome air conditioners with modern heating, ventilation and air conditioning system. Project included a new state-of-the-art temperature controls system and recommissioning of existing heating and ventilation systems. (Total project cost: $80,000) • Pasco MPO Air Compressors – Mechanical and electrical design for the replacement of out-dated air compressors with larger, modern compressors to allow for future expansion. (Total project cost: $75,000) • Zillah MPO HVAC Replacement – Mechanical and electrical design for the replacement of old unreliable air conditioners with new, modern air conditioning system. (Total project cost: $25,000) • Yakima MPO Air Compressor Replacement – Mechanical and electrical design for the replacement of out-dated and undersized air compressors with larger, modern compressors. (Total project cost: $75,000) • Seattle MPO Chiller – Urgent site visit and evaluation of a summertime chiller failure serving the main downtown post office. Resulted in a fast-track mechanical and electrical document preparation for the chiller replacement, followed by further electrical design for service upgrades. (Total project cost: $75,000) • Eugene Processing and Distribution Facility – Mechanical and electrical design criteria and construction cost estimate for design/build remodel of an existing 85,000 sf processing and distribution facility and new construction of a 70,000 sf addition to the facility. (Total project cost: $1,700,000) • Seattle BMEU – Mechanical and electrical study, report and cost estimating for the addition of new conditioned space to an existing parking garage. (Total project cost: $150,000) • North Bend Postal Office – Mechanical and electrical design for the replacement of the heating, ventilation, and air conditioning system. (Total project cost: $25,000) • Snoqualmie Postal Office – Renovations including HVAC modifications. (Total project cost: $800,000.) • Lynwood Postal Office – Design of oil-water separator. (Total project cost: $150,000.) • Bellevue Postal Office – Renovation including HVAC modifications. (Total project cost: $100,000.) • Seattle Bulk Mail Center- Restroom upgrade, including plumbing and lighting design. (Total project cost: $150,000.)